THE INDIAN RIVER LINKING PROJECT (IRLP)


THE INDIAN RIVER LINKING PROJECT (IRLP)

Map---Indias-river-linkin-001Background

1. On February 27, the Indian Supreme Court ordered the Indian government to start implementing the Indian River Linking Project (IRLP) within 30 days and complete it by 2016.

2. The order came as a rude shock after several years’ hiatus during which the IRLP had somewhat receded from the scene. True that IRLP was never completely abandoned by the Indian government, even after the strong protest it generated both inside and outside India in 2002, when proponents of IRLP pushed it through an earlier Supreme Court ruling. This time however, the court has gone further, forming even a project implementation committee.

THE INDIAN RIVER LINKING PROJECT (IRLP)3. According to various sources, IRLP envisages transfer of 334 billion cubic meters of water through construction of 30 inter-river links, involving 36 big dams, 94 tunnels, and 10,876 kilometers of canals. The project has two parts, namely the Himalayan and the Peninsular (see IRLP map in Figure 1 below), and the estimated cost of the project varies from $150 to 250 billion.

INDIAN RIVER LINKING PROJECT4. The project is based on the notion that some river basins are “surplus” while others are “deficit,” so that transfer of water from the former to the latter will be beneficial. However, this is a classic example of erroneous and dangerous abstraction based on very superficial understanding of the nature of the problem.

RIVER LINKING PROJECT 15. A closer examination shows that different rivers with different volumes of annual and seasonal discharge and flowing through different terrains are part of the earth’s natural diversity, just as hills and valleys of different elevation. Each river develops a unique ecology (with corresponding flora and fauna) and economy (with corresponding cropping, settlement, and transportation pattern, etc.) and culture. Large-scale diversion of water from one basin to another ultimately harms both, as earlier examples show. For example, diversion of the Amu Darya and Syr Darya Rivers led to the death of the Aral Sea and gave rise to new problems of water logging and salinity in Kazakhstan (see pictures in Figure 2a and 2b below).

image0096. Researchers have expressed doubts about IRLP on grounds of lack of technical, financial, and economic feasibility and viability. They have pointed out further that transfer from another river cannot overcome the perceived scarcity of water if choices with regard to crops, irrigation method, settlement and consumption pattern, etc. are not appropriate.

freshwater-rivers-colorado-2_45151_600x4507. River intervention projects like IRLP embody the Commercial Approach, which deems river water flowing into the sea a waste. Unfortunately, this approach leads to conflicts among co-riparian regions, states, and countries, because the volume of water is finite. It ultimately harms the river, sometimes causing its death, as has actually happened to several important rivers of the world. The approach is also harmful for the ecology of the river estuary and the marine environment.

image0078. Projects like IRLP are, instead of being the product of objective and comprehensive analysis, often the result of push from vested interests, as represented by the dam construction industry, engineering and consultancy firms, and other agencies and individuals who hope to get a share of the project budget.

g4-impact-of-climate-change-food-demands-and-transboundary-agreement-on-water-resources-in-the-ganges-basin-in-bangladesh-24-6389. Though the Himalayan and Peninsular parts of IRLP are often presented as separate, they are actually connected by several links (see map in Figure 1), and the main purpose of the project is to transfer water from the Brahmaputra and the Ganges Rivers to the south and west of India.

Figure 6- Dried up Teesta river in Bangladesh due to diversion of Teesta flow by India’s Gajoldoba Barrage10. Since 1974, India has been already transferring the Ganges flow away from Bangladesh through its Farakka barrage, causing drastic reduction of the downstream flow and enormous harm to the lower riparian country, Bangladesh (see Figures 3, 4, and 5). India is diverting Teesta flow through her Gajoldoba barrage, the downstream part of the river drying up in Bangladesh (see Figure 6). These and other diversions have led to drastic reduction in the sediment flow that is the key to Bangladesh’s survival against sea level rise caused by climate change (see Figure 7). India is putting around Bangladesh a ring of dams, barrages, and other water diversionary and flow control structures, which will choke off all river flow to Bangladesh (see Figure 8).

Figure 7- Drastic reduction in sediment flow to Bangladesh due to river intervention structures built by India on shared rivers11. Due to the diversion already carried out, the Brahmaputra River now serves as the source of about 70 percent of river water flow of Bangladesh during the dry season. Therefore, diversion of the Brahmaputra flow and added diversion of the Ganges flow and their tributaries through IRLP will lead to certain death of Bangladesh’s remaining rivers.

Figure 3- Drastic fall in Ganges flow and dried up Padma (Ganges) bed at Harding Bridge in Bangladesh due to India’s Farakka Barrage12. Both the Brahmaputra and the Ganges are international rivers. After flowing through India they enter Bangladesh before reaching the Bay of Bengal. Therefore, India does not have the right to transfer unilaterally water from them and their tributaries. IRLP clearly violates the 1997 UN Convention on Non-Navigational Uses of International Watercourses.[4] It contravenes the convention’s Article 7 which forbids countries from taking steps that can cause significant harm to co-riparian countries. IRLP violates the Convention’s Articles 20 and 23 that call for preservation of ecosystems of the river basin and of the marine environment, respectively. It violates Article 6 that asks countries to take into account co-riparian countries’ social and economic needs, existing and potential use, and size and interests of the population that depend on the river.

Figure 8- India’s ring of dams and barrages around Bangladesh13. There are reports that China is considering diversion of water from Yarlung Tsangpo, the upper reach of the Brahmaputra River lying in Tibet of China. It is highly contradictory on the part of India to oppose Chinese plans to divert the Brahmaputra flow, and ask Bangladesh to join her in this opposition, while itself engaging in diversion of river water away from Bangladesh. The competing diver diversion plans and projects of China and India illustrate the conflicts that the Commercial Approach to rivers generates.

Figure 4- Drastic fall in Ganges flow to Bangladesh across all seasons due to India’s Farraka Barrage14. India’s diversion of river water away from Bangladesh has harmed significantly Indo-Bangladesh relationship and has emerged as the most important obstacle to promotion of cooperation between these two countries in other areas. For example, it has made it difficult for Bangladesh to grant India transit through her territory to India’s northeastern states. IRLP will further damage the Indo-Bangladesh relationship and will make cooperation almost impossible in the future.

Demands and recommendations

7310633718_ffe5f84075_o15. In view of the above, Bangladesh Environment Network (BEN), the global network of non-resident Bangladeshis, joined by other Bangladeshi organizations and citizens, and their international friends,

a) Demands that India stops proceeding further with the river linking project, in so far as it affects international rivers, such as the Brahmaputra and the Ganges and their tributaries. Though we are opposed to river linking in general, we leave it up to Indian citizens themselves whether they would like linking of rivers that are entirely domestic to India.

b) Demands that India decommissions Farakka barrage, Gajoldoba barrage, and all other dams and barrages that it has constructed on international rivers and rivers that affect the flows of these international rivers.

c) Demands that India abandons all under-construction and planned diversionary and unilateral flow control structures on rivers that enter from India to Bangladesh

d) Recommends that India abandons the current Commercial Approach to rivers and instead adopts the Ecological Approach that discourages intervention in the direction and volume of natural river flow so that rivers can be bonds of friendship among co-riparian neighbors instead of being a source of contention and conflict. Only adoption of the Ecological approach can give India the moral right to oppose China’s plan of diversion of the Brahmanputra flow and to urge Bangladesh join her in this opposition.

Gradual shrinkage and death of the Aral Sea caused by the diversion of water from the Amu Darya and Syr Darya Rivers

*********************************************************

JUNE 04, 2015

BEN_Logo_813459872_511039977

Advertisements

About Ehsan Abdullah

An aware citizen..
This entry was posted in CHALLENGES, CLIMATE - Global Warming Challenge, CURRENT ISSUES, DEFENCE & SECURITY, FOREIGN RELATIONS & POLICY, REGIONAL COOPERATION, Regional Policy, SAARC, STRATEGY & POLICY and tagged . Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s